OUR EXPERIENCE
Airport
Transportation
Public Works
Public Facilities & Buildings
Offices
Multi-dwellings
Retail & Service
Residential
Bulkheads & Levees
Warehouses
Religious
Educational
Telecommunications
Industrial
Inspections & Assessments
.
OUR EXPERIENCE
Airport | Transportation | Public Works | Public Facilities & Buildings | Offices | Multi-dwellings | Retail & Service | Residential | Bulkheads & Levees | Warehouses | Religious | Educational | Telecommunications | Industrial | Inspections & Assessments
  AIRPORT Louis Armstrong New Orleans International Airport  
Consolidated Rental Car Facility
Louis Armstrong New Orleans International Airport
Kenner, LA

Synopsis
Owner: New Orleans Aviation Board
Client: Coover-Clark & Associates (architect)
Project Cost: $70 million
Original Start Date: February 2001
Second Startup Date: July 2008
Estimated Construction Completion: December 2013

Project Description
The project involves redeveloping about40 acres of property into a consolidated location to better manage car rental operations. Specifically, the project involves demolishing existing buildings and site infrastructure, constructing new buildings, site paving, and infrastructure. Buildings included a multi-story parking garage (not designed by Julien), a Customer Service Building, and more than dozen individual structures to support vehicle maintenance. The project also includes a water tank, water well, and replacement utility building as well as new stormwater drainage, sanitary sewerage, and water supply infrastructure. The most challenging aspect of the project was the difficulty in designing infrastructure improvements with limited information on prior subsurface conditions. Julien Engineering performed civil and structural engineering design.
 

Ground Transportation Consulting Services

Task assignments performed since 1997 for various transportation improvements

Subconsultant to Urban Systems, Inc.

Description of work:

> Engineering design and development of plans and specs for various ground transportation improvements
> Roadway pavement, signage, signalization, pedestrian walkways, etc.

 

Rehabilitation of Taxiway Sierra and Runway I-19
Design: 2001 Construction completion: 2003

Subconsultant to W. O. Johnson & Associates
(We miss our good friend Willie O. Johnson, PE who recently passed.
Mr. Johnson is a well respected engineer who inspired many.
Rest In Peace.)

Description of our portion of work:

>  Assessment of pavement of active taxiway and runway
> Concrete sampling (coring), analysis, and testing
> Repair, replacement and overlay of asphaltic and portland cement concrete pavement
> Engineering design and development of plans and specs
> Construction administration
 
 Airport Canal Closure (Airfield Safety Improvements)
Design: 2003
Anticipated Construction completion: 2005

Subconsultant to Pepper & Associates

Description of our portion of work:

> Assessment of open canal structures
> Stormwater drainage analysis
> Structural design for box culverts and other drainage structures
> Engineering design and development of plans and specs
> Construction administration
 
New Parking Garage

Design: 2001
Construction completion: 2003

Subconsultant to Walker Parking Consultants, Tampa, FL

Description of our portion of work:

Roadway realignment and reconstruction, water supply lines and     appurtenances, subsurface drainage structures, sewer lines and appurtenances, adjacent ground surface parking lot
Engineering design and development of plans and specifications
Construction administration
 

Continental Presidents Club, Concourse C
Design: 1999
Construction completion: on hold

Subconsultant to Spencer Partnership Architects

Description of our portion of work:

> Civil engineering for a 2-story addition to an existing concourse
> Site survey, drainage, water connections; reinforced concrete pavement
> Repair, replacement and overlay of asphaltic and portland cement concrete pavement
> Engineering design and development of plans and specs
> Construction administration

 
Intersection of Airline Highway & Cargo Road
Designed: 2001
Construction Completed: 2002

Subconsultant to Urban Systems, Inc.

Description of work:

> Reconfigure and signalize existing state highway intersetion
> Civil Engineering design
> Development of plans and specifications
> Roadway pavement, signage, signalization, etc.
 
Lower Roadway Improvements, Louis Armstrong New Orleans International Airport

Rental Car Shuttle Bus Planning, Louis Armstrong New Orleans International Airport

Airport Signage Inventory & Planning, Louis Armstrong New Orleans International Airport

Strategic Master Plan - Louis Armstrong New Orleans International Airport

Reroofing of the DHL/Airborne Express Cargo Hangar - Louis Armstrong New Orleans International Airport

MSY Hurricane Civil/Structural Damage Assessments - Louis Armstrong New Orleans International Airport

BACK ON TOP

  PUBLIC WORKS  

Street Rehabilitation: Erickson St., Finland St., Hyman St., and Rhodes Ave. - New Orleans, LA

Design:  1997  (funding delay)   Anticipated Construction Completion: 2003

Description of our work:

  • Assessment of existing concrete and asphalt pavement
  • Engineering design and development of plans and specifications
  • Replacement of street pavement
  • Replace subsurface drainage structures, water and sewer lines and appurtenances
  • Tree preservation (existing large oak trees line most of the streets included), and sidewalks, driveways, etc. 
  • Construction administration and Resident Inspection

Somerset St. & Berkley St.
(2 residential streets approx. 1 mile)

Design:  2003 (Katrina delay)   Anticipated Construction Completion: 2007

Description of our work:

  • Assessment of existing concrete and asphalt pavement
  • Engineering design and development of plans and specifications
  • Replacement of street pavement
  • Replace subsurface drainage structures, water and sewer lines and appurtenances
  • Tree preservation (existing large oak trees line most of the streets included), and sidewalks, driveways, etc. 
  • Construction administration and Resident Inspection

Street Rehabilitation: Law St. (Eads - Almonaster) - New Orleans, LA

Sewage Pumping Station Improvements at 28 sites - Sewerage & Water Board of New Orleans

New 42" Sewer Force Main, Euphrosine St. - Sewerage & Water Board of New Orleans

Upgrade of Sewage Pumping Station 1 - Sewerage & Water Board of New Orleans
Southshore Sewer System Evaluation and Study - Sewerage & Water Board of New Orleans

Lower Ninth Ward Sewer Rehabilitation - Sewerage & Water Board of New Orleans

Napoleon Avenue Drainage Canal II - Sewerage & Water Board of New Orleans

Airport Drainage Canal Closure - Louis Armstrong New Orleans International Airport

St. Charles Avenue Streetcar Catenary Renovation - New Orleans Regional Transit Authority

Quality Assurance Services for Hurricanes Katrina and Rita in New Orleans - U.S. Army Corps of Engineers

BACK ON TOP

  TRANSPORTATION  
 

St. Charles Avenue Streetcar Catenary Renovation - New Orleans Regional Transit Authority

Street Rehabilitation: Somerset St. (MacArthur - Berkley) and Berkley St. (Huntlee - Kabel) - New Orleans, LA

Street Rehabilitation: Law St. (Eads - Almonaster) - New Orleans, LA
 

BACK ON TOP

  PUBLIC BUILDINGS & FACILITIES
 
 

Demolition of Trailways Building
and Environmental Remediation


City of New Orleans, Capital Projects Administration

Design:  2000        Demolition and Remediation: 2001

Description of work:

  • Demolition of bus depot building and site work
  • Asbestos abatement, underground storage tank removal
  • Environmental remediation, and permitting, 
  • Miscellaneous site improvements
  • Conversion of site to new parking lot
  • Engineering design and development of plans and specs
  • Construction administration

Moonwalk Improvements, New Orleans, LA
(Mississippi River outlook in the French Quarters)
Audubon Institute, New Orleans, LA

Design:  1998       Construction completed: 1999

Subconsultant to E. Eean McNaughton Architects

Description of work:

  • Life safety improvements and miscellaneous upgrades for tourist attraction
  • Remove and replace existing concrete pavement and brick pavers
  • Site located on top of Mississippi River levee
  • Concrete base and stairways, handicap ramp, security building
  • Flagstone and brick pavers, heavy timber stair amendments
  • Dedication monument, light stanchion bases, etc.
  • Civil engineering design assistance and construction inspection

Phase IV Expansion - Morial Convention Center, New Orleans, LA

George Washington Carver Memorial
St. Louis, Missouri

Missouri Botanical Gardens

Design:  2003        Construction completion: planning

Subconsultant to Terra Designs, Inc.

Description of work:

  • Civil design; development of plans and specifications
  • Design elements:  statue structural support, reflecting pond, stormwater drainage, asphalt paving, cantilever reinforced concrete retaining wall

George Washington Carver Memorial
St. Louis, Missouri

Missouri Botanical Gardens

Harvey Multipurpose Center

Jefferson Parish, LA

Design: 1994 Construction: 1995

Kerwin Julien, PE performed civil and structural design for the
project while employed with another firm as a subconsultant for
Billes-Manning Architects

Description of work:

  • Construction of a 8,000 sq. ft. community center
  • Pile supported reinforced concrete slab
  • Special arched steel framed roof trusses
  • CMU and brick veneer walls
  • Concrete paved parking lot, chain link fencing and other site amenities
  • Civil and structural engineering design and development of plans and specs
  • Construction administration


Street Reconstruction and Rehabilitation - Law St. (Eads to Almonaster) - City of New Orleans, Department of Public Works

Street Reconstruction and Rehabilitation - Somerset, Berkley - City of New Orleans, Department of Public Works

5th District Police Station Site Improvements - City of New Orleans, Capital Projects Administration and New Orleans Police Department

Reroofing of New Orleans Police Stables at City Park, New Orleans, LA

Ropes Course at Joe Brown Park - City of New Orleans, Capital Projects Administration and New Orleans Recreation Department

Algiers Multipurpose Center - Preliminary Design - City of New Orleans, Capital Projects Administration

Settlement Monitoring at BCE Building, U. S. Naval Air Station, Belle Chasse, LA

Alameda Heights Gymnasium, Dallas, TX

Sewer Line Replacement - Southern University at New Orleans, North Campus

Transportation and Parking Facilities Repairs - Louis Armstrong New Orleans International Airport

TACA Hangar Demolition - Louis Armstrong New Orleans International Airport

BACK ON TOP

  OFFICES
 
Allstate Office Building, 2028 Paxton Street, Harvey, LA

Designed: 1998 Construction Completed: 1999

Description:

Engineering design and development of complete plans and specifications
New construction on an undeveloped 1/2 acre site
Office building (4,000 sq. ft.), timber framing, stucco exterior, monoslope roof, storefront windows, 4-rental units
Associated site work including concrete pavement, underground drainage, etc.

State Farm Office Building, Manhattan Blvd., Harvey, LA

Designed:  1994        Construction Completed:   1995

Description:

  • Engineering design and development of complete plans
  • New construction on an undeveloped 1/4 acre site
  • Office building (4,000 sq. ft.), timber framing, stucco exterior, pitched roof, storefront windows, 4-rental units
  • Associated site work included concrete pavement, underground drainage, etc.

WITCO Administration Building, Taft, LA

Designed:  1999        Construction Completed:   2000

Description:

  • Engineering design and development of complete plans and specs
  • New 24,830 sq. ft., 2-story office building at an existing petro-chemical plant site
  • Prefabricated metal building shell, bar-joist and cast-in-place concrete floor on metal deck, pile-supported cast-in-place concrete slab
  • Cold formed metal stud room framing, metal siding and brick veneer exterior, monoslope metal roof, suspened acoustical ceiling, zoned HVAC units, lighting, sprinkler and alarm systems, storefront windows, several offices and support facilities
  • Associated site work included utility connections

New Canopy at 1250 Poydras St., New Orleans, LA

Epic Center, General DeGaulle Drive, New Orleans, LA

BACK ON TOP

  MULTI-DWELLINGS
 

New Adult Residential Care Facility for the Elderly

Poydras Home, Independent Living
Magazine St., New Orleans, LA

Designed:  1999        Construction Completion:   2001

Description:

  • Civil and Structural Engineering design
  • Development of plans and specs for scope
  • New construction on an existing developed site
  • Three-story building (9,000 sq. ft.)
  • Steel stud framing, pile supported concrete slab,
  • Elevated concrete floors on metal deck, pitched gabled-roof
  • Associated site work included concrete pavement, underground drainage etc.

Addition to Assisted Living Facility for the Elderly

Poydras Home, Alzheimer's Addition
Magazine St., New Orleans, LA

Designed:  1999        Construction Completion:   2001

Description:

  • Civil and Structural Engineering design
  • Development of plans and specs for scope
  • New construction on an existing developed site
  • Single-story addition (5,300 sq. ft.)
  • Steel stud framing, pile supported concrete slab, pitched gabled-roof,
  • Associated site work included concrete pavement, underground drainage etc.

New Apartment Building

Boyd Manor Apartments, New Orleans, LA

Designed:  2000        Construction Completion:   2002

Description:

  • Civil and Structural Engineering design and management of Electrical, Mechanical and Plumbing Engineering efforts
  • Complete Construction Management and Acting Local Professional-of-Record during construction
  • Development of plans and specs for civil/structural scope
  • New construction on an existing developed site
  • Three-story building (32,000 sq. ft.), timber stud framing, pile supported concrete slab, concrete floors on timber sub-floor, pitched hip-roof, brick veneer
  • Associated site work included concrete pavement, sewerage, water supply, and underground drainage etc.

Building Conversion / Renovation

Volunteers of America, Multi-Tenant Facility, Canal St., New Orleans, LA

Designed:  2000        Construction to be Complete:   2002

Description:
Structural Engineering design
Development of plans and specs for remedial structural renovations
Existing two-story building (18,045 sq. ft.)
Load-bearing masonry exterior walls, heavy timber interior framing
Building was a former vehicular showroom and warehouse in disrepair
Renovations included replacement of first floor interior slab, reconfiguring second floor timber framing for new atrium, replacement of fire and rot damaged framing, addition of second floor concrete deck, removal and closure of old vehicular elevator shaft, installation of interior cold formed metal stud framing, reinforcement of cracked masonry walls


Imperial Drive Development, New Orleans, LA
General Ogden Development, New Orleans, LA

Tchoupitoulas Development, New Orleans, LA

Walnut Square Apartments, Redevelopment, New Orleans, LA

CJ Peete Redevelopment, New Orleans, LA

New Adult Residential Care Facility for the Elderly (Independent Living) - Poydras Home, New Orleans, LA

New Alzheimer's Addition to Assisted Living Facility for the Elderly - Poydras Home, New Orleans, LA

Ames Creek Apartments - SAT Development, Marrero, LA

New Apartment Building - Boyd Manor - National Baptist Convention, New Orleans, LA

Building Renovation - Volunteers of America, New Orleans, LA

New Townhouses (planning) - Swilling Design & Development, New Orleans, LA

Algiers Riverview Condominiums - Patterson Riverside Development, New Orleans, LA

Hendee Homes - Housing Authority of New Orleans, Algiers, LA

Coleman Building, Marrero, LA
 

BACK ON TOP

  RETAIL & SERVICE

 

New Gas Station & Convenience Store

Spur Discount Zone, Westbank Expressway, Westwego, LA

Designed:  1997           Construction completed:  1998

Description of Work:

  • Engineering design and development of complete plans and specs
  • New construction on an undeveloped 3 acre site
  • Construction of new gas station / convenience store (4,000 sq. ft.)
  • Associated site work including truckstop facilities
  • Underground storage tanks, concrete pavement, overhead canopies, pump islands, underground drainage, etc.
  • Steel building frame, concrete masonry block, metal studs, gypsum board, suspended ceiling, HVAC, lighting, walk-in cooler, beverage station, office, storage, customer area, cashier area, etc.

  Hibernia National Bank, Belle Terre Blvd., LaPlace, LA

Designed:  2000        Construction Completion:   2000

Description:

  • Civil and Structural Engineering design
  • Development of plans and specs for scope
  • New construction on an existing undeveloped site
  • Single-story building (1,500 sq. ft.), structural steel framing, pile supported concrete slab, pitched gable-end roof, metal roofing over metal deck
  • Associated site work included reinforced concrete pavement, underground drainage, sign foundation, etc.

  Spur Station, Al-Zaharra, Inc., 2120 Lapalco Blvd., Harvey, LA

Designed:  1999        Construction Completed:   2000

Description:

  • Engineering design and development of complete plans and specifications
  • Demolition of existing service station
  • Construction of new gas station / convenience store on a 0.4 acre site
  • Convenience store (1,800 sq. ft.) and associated site work including underground storage tanks, concrete pavement, overhead canopy, pump islands, underground drainage, etc.
  • Steel building frame, concrete masonry block, metal studs, gypsum board, suspended ceiling, HVAC, lighting, walk-in cooler, beverage station, office, storage, customer area, cashier area, etc.

  Hibernia Lakeview, Harrison Ave., New Orleans, LA

Designed:  2000        Construction Completion:   2000

Description:

  • Civil and Structural Engineering design
  • Development of plans and specs for scope
  • New construction on an existing developed site
  • Single-story building (1,500 sq. ft.), structural steel framing, pile supported concrete slab, pitched gable-end roof, metal roofing over metal deck
  • Associated site work included reinforced concrete pavement, underground drainage, sign foundation, etc.

New Veterinarian Clinic & Boarding Kennel

Acadiana West, Manhattan Blvd., Harvey, LA

Designed:  1999           Construction completed:  2001

Description of Work:

  • Engineering design and development of complete plans
  • New construction on an undeveloped 1.28 acre site
  • Construction of veterinarian clinic (2,825 sq. ft.) with boarding and animal care facilities, offices and associated site work including concrete paved parking lot, underground drainage, planning for future expansion, etc.
  • Pre-engineered metal building frame, metal siding and brick veneer, interior metal studs, gypsum board, masonry dog runs with chain link gates, suspended ceiling, HVAC, lighting, office support, storage, etc.


New Gas Station & Convenience Store Complex - Spur Discount Zone, St. Claude & Lizardi St., New Orleans, LA

Spur Station Renovation - Spur Discount Zone, Gen. DeGaulle Dr. & MacArthur Blvd., New Orleans, LA

BACK ON TOP

  RESIDENTIAL
 

MULTI-RESIDENTIAL and DEVELOPMENTS:
Hendee Homes, Housing Authority of New Orleans

Algiers Riverview Condominiums, New Orleans, LA

1039 Constance St Condominiums, New Orleans, LA

Elmwood Homes Development, New Orleans

Patterson Homes, New Orleans, LA

Indiana Homes, New Orleans, LA

SINGLE FAMILY:
Stephani Residence, Gretna, LA
Lockett Residence, Marrero, LA
Romain Residence, New Orleans, LA
Engen Residence, New Orleans, LA
Lot 38, Abalon Court, New Orleans, LA
Lot 69, Abalon Court, New Orleans, LA
Lot 75, Abalon Court, New Orleans, LA
Meyer Residence, Lark St., New Orleans, LA
Residential Steel Framed Prototype for Olde Orleans Design Group, New Orleans, LA

BACK ON TOP

  BULKHEADS & LEVEES


Brazilier Island Bulkhead, Lake Catherine, New Orleans, LA

Sheet Pile Wall Replacement, West Hackberry, Department of Energy Strategic Petroleum Reserves, Lake Charles, LA

Sheet Pile Walls at Airline Highway Jefferson Parish Bus Stops, Metairie, LA

New Orleans to Venice Hurricane Protection Levee, Plaquemines Parish, LA


and many more
 

BACK ON TOP

  WAREHOUSES
 
 

New Warehouse/Office Addition

A-1 Appliance Warehouse, Industrial Blvd., Harvey, LA

Designed:  2000        Construction Completed:   2001

Description:

  • Engineering design and development of complete plans and specifications; construction management
  • Construction of a new warehouse/office addition (37,000 sq. ft.) to an existing warehouse/office (20,250 sq. ft.) on an developed 2 acre site
  • Prefabricated metal building framing, steel stud secondary framing, metal and concrete masonry exteriors, pitched metal roof, roll-up doors, truck wells, truck ramps, etc.
  • Associated site work included a new remote concrete paved parking lot, underground drainage, etc.

Eastbank Electric Motors, Kenner, LA

Designed:  1998           Construction completed:  1998

Description of Work:

  • Engineering design and development of complete plans and specs
  • New construction on an undeveloped 0.72 acre site
  • Construction of new office/warehouse (4,710 sq. ft.)
  • Associated site work including electric motor shop facilities, overhead hoist/cranes, concrete paved parking lot, underground drainage, etc.
  • Pre-engineered metal building frame, metal siding, interior metal studs, gypsum board, suspended ceiling, HVAC, lighting, office support, storage, etc.

Eagle Distributors, Kenner, LA

Designed:  2000           Construction completed:  2000

Description of Work:

  • Engineering design and development of complete plans
  • New construction on an undeveloped 0.80 acre site
  • Construction of new office/warehouse (11,478 sq. ft.) and associated site work including distributor showroom areas, concrete paved parking lot, underground drainage, etc.
  • Pre-engineered metal building frame, metal siding, interior metal studs, gypsum board, suspended ceiling, HVAC, lighting, office support, storage, etc.

AAA Sports, Kenner, LA

Designed:  1998           Construction completed:  1998

Description of Work:

  • Engineering design and development of complete plans
  • New construction on an undeveloped 0.22 acre site
  • Construction of new office/warehouse (4,908 sq. ft.) and associated site work including t-shirt facilities, vertical storage areas, concrete paved parking lot, underground drainage, etc.
  • Pre-engineered metal building frame, metal siding, interior wood and metal studs, gypsum board, suspended ceiling, HVAC, lighting, special electrical requirement for high voltage equipment, office support, storage, etc.

Delta Waste Office/Warehouse, Harvey, LA

Designed:  1999        Construction Completed:   1999

Description:

  • Engineering design and development of complete
    plans and specifications
  • Conversion of an existing 21,750 sq. ft. open sided warehouse into office/warehouse and vehicular maintenance facility for a waste management company on a 2.6 acre site
  • Office improvements and interior addition (1,587 sq. ft.) and vehicle maintenance area (20,163 sq. ft.)
  • Foundation construction within an existing prefabricated metal building structure
  • New exterior metal siding, overhead roll-up doors, roof vents, lighting, etc.
  • Associated site work included a new concrete paved parking lot, driveway, etc.

New Storage Facility

Belle Chasse Self-Storage, Belle Chasse, LA

Designed:  1999           Construction completed:  1999

Description of Work:

  • Engineering design and development of complete plans
  • New construction on an undeveloped site
  • Construction of single story storage facility (17,500 sq. ft.) and associated site work including various individual storage units, office area, concrete paved parking lot, etc.
  • Pre-engineered metal building frame, metal siding, interior metal studs, gypsum board, suspended ceiling, HVAC, lighting, office support, storage, etc.

New Warehouse (Shop)

Weavers Beauty Supply, Marrero, LA

Designed:  1999           Construction completed:  1999

Description of Work:

  • Engineering design and development of complete plans and specs
  • New construction on an undeveloped site
  • Construction of new office/warehouse (6,000 sq. ft.) and associated site work including wholesale customer facility, concrete paved parking lot, underground drainage, etc.
  • Pre-engineered metal building frame, metal siding, interior metal studs, gypsum board, suspended ceiling, HVAC, lighting, office support, storage, etc.

BACK ON TOP

  RELIGIOUS
 

Building Conversion / Renovation

Beacon Light Missionary Baptist Church at St. Anthony St., New Orleans, LA

Designed:  1997        Construction Complete:   1998
Description:

  • Civil and Structural Engineering design
  • Development of plans and specs for scope to convert an existing
    abandoned grocery store into a place of worship
  • Existing 1-1/2-story building (32,950 sq. ft.), structural steel columns,
    steel bar joists, masonry exterior walls, interior  concrete slab
  • Renovations included removal of some interior columns and load
    bearing framing and replacement with custom made structural truss
    and steel pipe columns, reconfiguring structural framing on second
    floor for new spaces, replacement of  damaged framing, addition of
    second floor concrete deck, addition of elevator shaft, installation of
    interior cold formed metal framing, reinforcement of cracked masonry walls
  • Associated site work included complete replacement of parking lot
    pavement, reconfiguring and replacement with reinforced portland
    cement concrete pavement, landscaping, etc.

Greater King Solomon

West Marrero Baptist Church

Change A Generation

BACK ON TOP

  EDUCATIONAL
 
 

New Classroom Building
St. Augustine High School, New Orleans, LA

Designed:  2003    Construction Completed: 2005
Description:

  • Design and plans and specs for civil and structural engineering

  • New construction on an existing high school campus

  • Three-story building, structural steel framing, pile supported concrete slab,
    non-composite concrete on metal deck upper floor, hipped multi-level roof,
    metal stud framing on 3rd level

  • Narrow site, subsurface drainage, water and sewer lines and appurtenances,
    concrete and asphalt paving, etc.

New Instrumental and Vocational Music Building

St. Stanislaus College, Bay St. Louis, MS

Design:  2002        Construction completion: 2006
Subconsultant to Award-Winning  E. Eean McNaughton Architects

Description of work:

  • New steel framed building
  • Civil and Structural engineering design
  • Development of plans and specifications
  • Construction administration

DUICEF - New Classroom Building
Dillard University, New Orleans, LA
Architect: David Brody Bond

Designed: 2002 Completed: 2003
Description:

Structural Engineering design
Development of plans and specs for scope
New construction on an existing university campus
Two-story building (30,000 sq. ft.)
Structural steel framing, pile supported concrete slab
non-composite concrete on metal deck upper floor mono-slope
and canted semi-flat roof, built-up roofing over metal deck
Challenging design effort included coping with angular wall and roof lines

Stern Hall Renovations

Dillard University, New Orleans, LA

Design: 2002 Construction completed: 2004
Subconsultant to B/H/M/W Architects
(Joint venture of Billes/Manning and Hewitt/Washington)

Description of work:

Upgrade of HVAC, Electrical and Mechanical Works and Interior Renovations
New Mechanical Penthouse over existing mechanical/boiler room
Renovations to classrooms, restrooms and other spaces
Conversion of existing attic space to new classrooms, etc.
Retrofit new structural steel within existing tightly enclosed
spaces for creation of new floors above
Challenging environment also required reinforcement of existing
structurally eclectic framing system to accommodate new work
Structural engineering design and development of plans and specs
and construction administration
 

Districtwide Demolitions and Site Improvements at Various Schools
Orleans Parish Public Schools, New Orleans, LA

Design: 1998 Construction completed: 1999

Description of work:

Management of demolition of various old school structures
Pavement replacement, fencing, and miscellaneous site work
Engineering design and development of plans and specs
Construction administration

Districtwide Demolitions and Site Improvements at Various Schools
Orleans Parish Public Schools, New Orleans, LA

Design: 1998 Construction completed: 1999

Description of work:

Management of demolition of various old school structures
Pavement replacement, fencing, and miscellaneous site work
Engineering design and development of plans and specs
Construction administration

  Waterproofing, HVAC, ADA, Labs, Etc. at Fortier High School
Orleans Parish Public Schools, New Orleans, LA

Design: 1997 Construction completed: 1999

Subconsultant to Hewitt-Washington & Associates, Inc.

Description of work:

Life safety improvements and miscellaneous upgrades
New 4-stop elevator retrofit to the existing school building
New HVAC system, restroom replacements, interior slab replacement
New parking lot, underground drainage, etc.
Civil and structural engineering design and development of plans and specs and construction administration

  Main Building Replacement at Shaumburg Elementary

New Orleans Public Schools
Design: 1998 Construction completed: 2002
Subconsultant to Hewitt/Washington Architects

Description of work:

New 70,000 sqaure foot single story elementary school building
Pile-supported reinforced concrete slab
Pre-engineered metal building frame
Brick veneer with CMU backup
Civil and Structural engineering design and development of plans and specs
and construction administration

Fischer Elementary School Cafetorium, HVAC, and Asbestos - Orleans Parish Public Schools, New Orleans, LA

Districtwide Demolitions and Site Improvements at Various Schools - Orleans Parish Public Schools, New Orleans, LA

Districtwide Renovation of Floors at Various Schools - Orleans Parish Public Schools, New Orleans, LA

Sewer, Drain and Locker Room Improvements at Easton High School - Orleans Parish Public Schools, New Orleans, LA

HVAC and Structural Repairs at Warren Easton High School - Orleans Parish Public Schools, New Orleans, LA

Sewer Main Replacement at Southern University at New Orleans

New Dormitories at Southern University at New Orleans

Information Center at Southern University at Baton Rouge

BACK ON TOP

  TELECOMMUNICATIONS
   
 
New Fiber Optics Routing
Williams Communications, City of New Orleans Right-of-Way

Designed:  1998        Construction Completed:   1999

Description:

  • Engineering, permitting, and development of complete plans and specs
  • New construction of 42 miles underground fiber optics routing in public r/w from downtown New Orleans to the Mississippi State Line
  • Expansion of existing mass-media communications network

New Fiber Optics Routing
Enron Communications, City of New Orleans Right-of-Way

Designed:  1999        Construction Completed:   2000

Description:

  • Engineering, permitting, and development of complete plans and specs
  • New construction of 14 miles underground fiber optics routing in public
    r/w from downtown New Orleans to the St. Charles Parish Line
  • Expansion of existing mass-media communications network

New Fiber Optics Routing
American Metrocomm Corp. Inc., City of New Orleans Right-of-Way

Designed:  1995        Construction Completed:   1996

Description:

  • Engineering, permitting, and development of complete plans and specs
  • New construction of 5 mile underground fiber optics ring in the New Orleans CBD
  • Creation of new mass-media communications network
  • Several subsequent laterals to ensuing client-sites

Fiber Optics Routing

Vyvx, Inc., City of New Orleans Right-of-Way

Designed:  1997        Construction Completed:   1997

Description:

  • Engineering, permitting, and development of complete plans and specifications

  • Construction of a new 1 mile underground fiber optics routing in public right-of-way from UPT to a new POP site

  • Expansion of existing mass-media communications network

Fiber Optics Route Permitting in New Orleans R/W - Williams Communications

New Fiber Optics Routing, City of New Orleans - Sprint Communications

BACK ON TOP

  INDUSTRIAL
 
New Effluent Plant Building

Gaylord Container Corporation, Bogalusa, LA

Designed:  2000           Construction completed:  2001

Description of Work:

  • Engineering design and development of complete plans and specs
  • New construction on existing industrial plant site
  • Three-story industrial building (21,000 sq. ft.)
  • Heavy structural steel framed open sided building (galvanized), reinforced concrete footings, pitched metal roof, stairways and platform(s), masonry framed control room, reinforced concrete elevated floors on metal decking, heavy structural loading, and associated miscellaneous site work including provisions for process piping, cranes, hoistways, underground drainage, etc.

BACK ON TOP

  INSPECTIONS & ASSESSMENTS
 

Public and Institutional:
Hurricane Damage Structural Assessments, Dillard University, New Orleans, LA
Hurricane Damage Civil/Structural Assessments at Louis Armstrong New Orleans International Airport, Kenner, LA
U.S. Army Corps of Engineers, Quality Assurance Inspection Services in Support of Hurricanes Katrina and Rita - New Orleans, LA
Structural Inspection at the Third St. Fire Station, New Orleans, LA
Legal:
Arbitration for HANO vs. Residents Surrounding St. Thomas Housing Development - 80 homes affected by demo/construction at Florida
IMarket Street Commerce Center vs. Pacorini USA, Inc - Inspection of 410 Josephine St. (import/export metals goods storage facility)
Brenda Price, et. al. vs. HANO, et. al. - 33 homes affected by demolition and construction at the St. Thomas Housing Development

Residential and Commercial:
Structural Inspection at 1909 Robert St., New Orleans, LA
Structural Inspection at 2161 Rue Racine St., Marrero, LA
Structural Inspection at 2432 Jefferson St., New Orleans, LA
Structural Inspection at 3844 Aspen Drive, Marrero, LA
Structural Inspection at the Colesium Baptist Church, New Orleans, LA
Structural Inspection at 2024 Armstrong Drive, Marrero, LA
Structural Inspection at 5126 Annunciation St., New Orleans, LA
Structural Inspection at 501 Live Oak Dr., Metairie, LA
Structural Inspection at 1730 Lizardi St., New Orleans, LA

BACK ON TOP
Julien Engineering & Consulting, Inc.
Main Office: 3520 General De Gaulle Dr. Suite 1045, New Orleans, Louisiana 70114
Voice - 504.366.3454  | Facsimile: 504.366.8726

 

 

 

    Copyright © Julien Engineering & Consulting, Inc. All Rights Reserved   Home | Contact | Careers