Consolidated Rental Car
Facility
Louis Armstrong New Orleans International
Airport
Kenner, LA
Synopsis
Owner: New Orleans Aviation Board
Client: Coover-Clark & Associates (architect)
Project Cost: $70 million
Original Start Date: February 2001
Second Startup Date: July 2008
Estimated Construction Completion: December 2013
Project Description
The project
involves redeveloping about40 acres of property
into a consolidated location to better manage
car rental operations. Specifically, the project
involves demolishing existing buildings and site
infrastructure, constructing new buildings, site
paving, and infrastructure. Buildings included a
multi-story parking garage (not designed by
Julien), a Customer Service Building, and more
than dozen individual structures to support
vehicle maintenance. The project also includes a
water tank, water well, and replacement utility
building as well as new stormwater drainage,
sanitary sewerage, and water supply
infrastructure. The most challenging aspect of
the project was the difficulty in designing
infrastructure improvements with limited
information on prior subsurface conditions.
Julien Engineering performed civil and
structural engineering design.
|
|
Ground Transportation
Consulting Services
Task assignments performed since 1997 for
various transportation improvements
Subconsultant to Urban Systems, Inc.
Description of work:
>
Engineering design and development of plans and
specs for various ground transportation
improvements
> Roadway
pavement, signage, signalization, pedestrian
walkways, etc. |
|
Rehabilitation of Taxiway
Sierra and Runway I-19 |
Design: 2001 Construction
completion: 2003
Subconsultant to W. O. Johnson & Associates
(We miss our good friend Willie O. Johnson, PE
who recently passed.
Mr. Johnson is a well respected engineer who
inspired many.
Rest In Peace.)
Description of our portion of work:
>
Assessment of pavement of
active taxiway and runway
>
Concrete sampling (coring),
analysis, and testing
>
Repair, replacement and
overlay of asphaltic and portland cement
concrete pavement
>
Engineering design and
development of plans and specs
>
Construction administration
|
|
Airport Canal Closure
(Airfield Safety Improvements) |
Design: 2003
Anticipated Construction completion: 2005
Subconsultant to Pepper & Associates
Description of our portion of work:
>
Assessment of open canal
structures
>
Stormwater drainage analysis
>
Structural design for box
culverts and other drainage structures
>
Engineering design and
development of plans and specs
>
Construction administration
|
|
New Parking Garage |
|
Design: 2001
Construction completion: 2003
Subconsultant to Walker Parking Consultants,
Tampa, FL
Description of our portion of work:
>
Roadway realignment and
reconstruction, water supply lines and
appurtenances, subsurface drainage structures,
sewer lines and appurtenances, adjacent ground
surface parking lot
>
Engineering design and
development of plans and specifications
>
Construction
administration
|
|
Continental Presidents Club,
Concourse C |
Design: 1999
Construction completion: on hold
Subconsultant to Spencer Partnership Architects
Description of our portion of work:
>
Civil engineering for a
2-story addition to an existing concourse
>
Site survey, drainage,
water connections; reinforced concrete pavement
>
Repair, replacement and
overlay of asphaltic and portland cement
concrete pavement
>
Engineering design and
development of plans and specs
>
Construction
administration
|
|
Intersection of Airline
Highway & Cargo Road |
Designed: 2001
Construction Completed: 2002
Subconsultant to Urban Systems, Inc.
Description of work:
>
Reconfigure and signalize
existing state highway intersetion
>
Civil Engineering design
>
Development of plans and
specifications
>
Roadway pavement, signage,
signalization, etc.
|
Lower
Roadway Improvements, Louis Armstrong
New Orleans International Airport
Rental
Car Shuttle Bus Planning, Louis
Armstrong New Orleans International Airport
Airport
Signage Inventory & Planning, Louis
Armstrong New Orleans International Airport
Strategic
Master Plan - Louis Armstrong New
Orleans International Airport
Reroofing
of the DHL/Airborne Express Cargo Hangar
- Louis Armstrong New Orleans International
Airport
MSY
Hurricane Civil/Structural Damage
Assessments - Louis Armstrong New
Orleans International Airport
BACK ON TOP |
|
|
|
|
|
|
Street Rehabilitation:
Erickson St., Finland St., Hyman St., and Rhodes
Ave. - New Orleans, LA
Design: 1997 (funding delay)
Anticipated Construction Completion: 2003
Description of our work:
- Assessment of existing
concrete and asphalt pavement
- Engineering design and
development of plans and specifications
- Replacement of street
pavement
- Replace subsurface drainage
structures, water and sewer lines and
appurtenances
- Tree preservation (existing
large oak trees line most of the streets
included), and sidewalks, driveways, etc.
- Construction administration
and Resident Inspection
Somerset St. & Berkley St.
(2 residential
streets approx. 1 mile)
Design:
2003 (Katrina delay) Anticipated Construction
Completion: 2007
Description of
our work:
- Assessment
of existing concrete and asphalt pavement
- Engineering
design and development of plans and
specifications
- Replacement
of street pavement
- Replace
subsurface drainage structures, water and
sewer lines and appurtenances
- Tree
preservation (existing large oak trees line
most of the streets included), and sidewalks,
driveways, etc.
-
Construction administration and Resident
Inspection
Street Rehabilitation: Law St. (Eads -
Almonaster) - New Orleans, LA
Sewage Pumping Station
Improvements at 28 sites - Sewerage & Water
Board of New Orleans
New 42" Sewer Force Main,
Euphrosine St. - Sewerage & Water Board of New
Orleans
Upgrade of Sewage Pumping
Station 1 - Sewerage & Water Board of New
Orleans
Southshore Sewer System Evaluation and Study -
Sewerage & Water Board of New Orleans
Lower Ninth Ward Sewer
Rehabilitation - Sewerage & Water Board of New
Orleans
Napoleon Avenue Drainage
Canal II - Sewerage & Water Board of New Orleans
Airport Drainage Canal
Closure - Louis Armstrong New Orleans
International Airport
St. Charles Avenue
Streetcar Catenary Renovation - New Orleans
Regional Transit Authority
Quality Assurance Services for Hurricanes
Katrina and Rita in New Orleans - U.S. Army
Corps of Engineers
BACK
ON TOP |
|
|
|
|
St. Charles Avenue
Streetcar Catenary Renovation - New Orleans
Regional Transit Authority
Street Rehabilitation:
Somerset St. (MacArthur - Berkley) and Berkley
St. (Huntlee - Kabel) - New Orleans, LA
Street Rehabilitation: Law
St. (Eads - Almonaster) - New Orleans, LA
BACK
ON TOP |
|
|
|
Demolition of Trailways
Building
and Environmental Remediation
City of New Orleans, Capital Projects
Administration
Design:
2000
Demolition and Remediation: 2001
Description of work:
- Demolition of
bus depot building and site work
- Asbestos
abatement, underground storage tank removal
- Environmental
remediation, and permitting,
- Miscellaneous
site improvements
- Conversion of
site to new parking lot
- Engineering
design and development of plans and specs
- Construction
administration
Moonwalk Improvements, New
Orleans, LA
(Mississippi River outlook in the French
Quarters)
Audubon Institute, New Orleans, LA
Design:
1998
Construction completed: 1999
Subconsultant to
E. Eean McNaughton
Architects
Description of work:
- Life safety
improvements and miscellaneous upgrades for
tourist attraction
- Remove and
replace existing concrete pavement and brick
pavers
- Site located
on top of Mississippi River levee
- Concrete base
and stairways, handicap ramp, security
building
- Flagstone and
brick pavers, heavy timber stair amendments
- Dedication
monument, light stanchion bases, etc.
- Civil
engineering design assistance and
construction inspection
Phase IV
Expansion - Morial Convention Center, New
Orleans, LA
George Washington Carver Memorial
St. Louis, Missouri
Missouri Botanical
Gardens
Design: 2003
Construction completion: planning
Subconsultant to
Terra Designs, Inc.
Description of
work:
- Civil design;
development of plans and specifications
- Design
elements: statue structural support,
reflecting pond, stormwater drainage,
asphalt paving, cantilever reinforced
concrete retaining wall
George Washington Carver
Memorial
St. Louis, Missouri
Missouri Botanical Gardens
Harvey Multipurpose
Center
Jefferson Parish,
LA
Design: 1994
Construction: 1995
Kerwin Julien,
PE performed civil and structural design for the
project while employed with another firm as a
subconsultant for
Billes-Manning Architects
Description of
work:
- Construction
of a 8,000 sq. ft. community center
- Pile
supported reinforced concrete slab
- Special
arched steel framed roof trusses
- CMU and brick
veneer walls
- Concrete
paved parking lot, chain link fencing and
other site amenities
- Civil and
structural engineering design and
development of plans and specs
- Construction
administration
Street Reconstruction
and Rehabilitation - Law St. (Eads to
Almonaster) - City of New Orleans, Department of
Public Works
Street Reconstruction
and Rehabilitation - Somerset, Berkley - City of
New Orleans, Department of Public Works
5th District Police
Station Site Improvements - City of New Orleans,
Capital Projects Administration and New Orleans
Police Department
Reroofing of New
Orleans Police Stables at City Park, New
Orleans, LA
Ropes Course at Joe
Brown Park - City of New Orleans, Capital
Projects Administration and New Orleans
Recreation Department
Algiers Multipurpose
Center - Preliminary Design - City of New
Orleans, Capital Projects Administration
Settlement Monitoring
at BCE Building, U. S. Naval Air Station, Belle
Chasse, LA
Alameda Heights
Gymnasium, Dallas, TX
Sewer Line Replacement
- Southern University at New Orleans, North
Campus
Transportation and
Parking Facilities Repairs - Louis Armstrong New
Orleans International Airport
TACA Hangar Demolition
- Louis Armstrong New Orleans International
Airport
BACK ON TOP |
|
|
Allstate Office Building,
2028 Paxton Street, Harvey, LA
Designed: 1998
Construction Completed: 1999
Description:
Engineering design and development of complete
plans and specifications
New construction on an undeveloped 1/2 acre site
Office building (4,000 sq. ft.), timber framing,
stucco exterior, monoslope roof, storefront
windows, 4-rental units
Associated site work including concrete
pavement, underground drainage, etc.
State Farm Office
Building, Manhattan Blvd., Harvey, LA
Designed: 1994
Construction Completed: 1995
Description:
- Engineering design and development of
complete plans
- New construction on an undeveloped 1/4
acre site
- Office building (4,000 sq. ft.), timber
framing, stucco exterior, pitched roof,
storefront windows, 4-rental units
- Associated site work included concrete
pavement, underground drainage, etc.
WITCO Administration
Building, Taft, LA
Designed: 1999
Construction Completed: 2000
Description:
- Engineering design and development of
complete plans and specs
- New 24,830 sq. ft., 2-story office
building at an existing petro-chemical plant
site
- Prefabricated metal building shell,
bar-joist and cast-in-place concrete floor
on metal deck, pile-supported cast-in-place
concrete slab
- Cold formed metal stud room framing, metal
siding and brick veneer exterior, monoslope
metal roof, suspened acoustical ceiling,
zoned HVAC units, lighting, sprinkler and
alarm systems, storefront windows, several
offices and support facilities
- Associated site work included utility
connections
New Canopy at 1250
Poydras St., New Orleans, LA
Epic Center, General
DeGaulle Drive, New Orleans, LA
BACK ON TOP |
|
MULTI-DWELLINGS |
 |
 |
 |
 |
|
New Adult Residential
Care Facility for the Elderly
Poydras Home, Independent Living
Magazine St., New Orleans, LA
Designed: 1999
Construction Completion: 2001
Description:
- Civil and Structural Engineering design
- Development of plans and specs for scope
- New construction on an existing developed
site
- Three-story building (9,000 sq. ft.)
- Steel stud framing, pile supported
concrete slab,
- Elevated concrete floors on metal deck,
pitched gabled-roof
- Associated site work included concrete
pavement, underground drainage etc.
Addition to Assisted
Living Facility for the Elderly
Poydras Home,
Alzheimer's Addition
Magazine St., New Orleans, LA
Designed: 1999
Construction Completion: 2001
Description:
- Civil and Structural Engineering design
- Development of plans and specs for scope
- New construction on an existing developed
site
- Single-story addition (5,300 sq. ft.)
- Steel stud framing, pile supported
concrete slab, pitched gabled-roof,
- Associated site work included concrete
pavement, underground drainage etc.
New Apartment Building
Boyd Manor Apartments, New Orleans, LA
Designed:
2000
Construction Completion: 2002
Description:
- Civil and
Structural Engineering design and management
of Electrical, Mechanical and Plumbing
Engineering efforts
- Complete
Construction Management and Acting Local
Professional-of-Record during construction
- Development
of plans and specs for civil/structural
scope
- New
construction on an existing developed site
- Three-story
building (32,000 sq. ft.), timber stud
framing, pile supported concrete slab,
concrete floors on timber sub-floor, pitched
hip-roof, brick veneer
- Associated
site work included concrete pavement,
sewerage, water supply, and underground
drainage etc.
Building Conversion /
Renovation
Volunteers of America, Multi-Tenant Facility,
Canal St., New Orleans, LA
Designed:
2000
Construction to be Complete: 2002
Description:
Structural Engineering design
Development of plans and specs for remedial
structural renovations
Existing two-story building (18,045 sq. ft.)
Load-bearing masonry exterior walls, heavy
timber interior framing
Building was a former vehicular showroom and
warehouse in disrepair
Renovations included replacement of first floor
interior slab, reconfiguring second floor timber
framing for new atrium, replacement of fire and
rot damaged framing, addition of second floor
concrete deck, removal and closure of old
vehicular elevator shaft, installation of
interior cold formed metal stud framing,
reinforcement of cracked masonry walls
Imperial Drive
Development, New Orleans, LA
General Ogden Development, New Orleans, LA
Tchoupitoulas
Development, New Orleans, LA
Walnut Square
Apartments, Redevelopment, New Orleans, LA
CJ Peete
Redevelopment, New Orleans, LA
New Adult Residential
Care Facility for the Elderly (Independent
Living) - Poydras Home, New Orleans, LA
New Alzheimer's
Addition to Assisted Living Facility for the
Elderly - Poydras Home, New Orleans, LA
Ames Creek Apartments
- SAT Development, Marrero, LA
New Apartment Building
- Boyd Manor - National Baptist Convention, New
Orleans, LA
Building Renovation -
Volunteers of America, New Orleans, LA
New Townhouses
(planning) - Swilling Design & Development, New
Orleans, LA
Algiers Riverview
Condominiums - Patterson Riverside Development,
New Orleans, LA
Hendee Homes - Housing
Authority of New Orleans, Algiers, LA
Coleman Building,
Marrero, LA
BACK ON TOP |
|
RETAIL & SERVICE |
 |
 |
 |
 |
|
New Gas
Station & Convenience Store
Spur
Discount Zone, Westbank Expressway, Westwego, LA
Designed: 1997
Construction completed: 1998
Description of Work:
-
Engineering design and development of complete
plans and specs
- New
construction on an undeveloped 3 acre site
-
Construction of new gas station / convenience
store (4,000 sq. ft.)
-
Associated site work including truckstop
facilities
-
Underground storage tanks, concrete pavement,
overhead canopies, pump islands, underground
drainage, etc.
- Steel
building frame, concrete masonry block,
metal studs, gypsum board, suspended
ceiling, HVAC, lighting, walk-in cooler,
beverage station, office, storage, customer
area, cashier area, etc.
Hibernia National
Bank, Belle Terre Blvd., LaPlace, LA
Designed: 2000
Construction Completion: 2000
Description:
- Civil and Structural
Engineering design
- Development of plans
and specs for scope
- New construction on
an existing undeveloped site
- Single-story
building (1,500 sq. ft.), structural steel
framing, pile supported concrete slab,
pitched gable-end roof, metal roofing over
metal deck
-
Associated site work included reinforced
concrete pavement, underground drainage,
sign foundation, etc.
Spur Station,
Al-Zaharra, Inc., 2120 Lapalco Blvd., Harvey, LA
Designed: 1999
Construction Completed: 2000
Description:
- Engineering design and development of
complete plans and specifications
- Demolition of existing service station
- Construction of new gas station /
convenience store on a 0.4 acre site
- Convenience store (1,800 sq. ft.) and
associated site work including underground
storage tanks, concrete pavement, overhead
canopy, pump islands, underground drainage,
etc.
- Steel building frame, concrete masonry
block, metal studs, gypsum board, suspended
ceiling, HVAC, lighting, walk-in cooler,
beverage station, office, storage, customer
area, cashier area, etc.
Hibernia Lakeview,
Harrison Ave., New Orleans, LA
Designed: 2000
Construction Completion: 2000
Description:
- Civil and Structural Engineering design
- Development of plans and specs for scope
- New construction on an existing developed
site
- Single-story building (1,500 sq. ft.),
structural steel framing, pile supported
concrete slab, pitched gable-end roof, metal
roofing over metal deck
- Associated site work included reinforced
concrete pavement, underground drainage,
sign foundation, etc.
New Veterinarian
Clinic & Boarding Kennel
Acadiana West, Manhattan Blvd., Harvey, LA
Designed: 1999
Construction completed: 2001
Description of Work:
- Engineering design and development of
complete plans
- New construction on an undeveloped 1.28
acre site
- Construction of veterinarian clinic (2,825
sq. ft.) with boarding and animal care
facilities, offices and associated site work
including concrete paved parking lot,
underground drainage, planning for future
expansion, etc.
- Pre-engineered metal building frame, metal
siding and brick veneer, interior metal
studs, gypsum board, masonry dog runs with
chain link gates, suspended ceiling, HVAC,
lighting, office support, storage, etc.
New Gas Station &
Convenience Store Complex - Spur Discount Zone,
St. Claude & Lizardi St., New Orleans, LA
Spur Station
Renovation - Spur Discount Zone, Gen. DeGaulle
Dr. & MacArthur Blvd., New Orleans, LA
BACK ON TOP |
|
RESIDENTIAL |
|
MULTI-RESIDENTIAL and DEVELOPMENTS:
Hendee Homes, Housing Authority of New Orleans
Algiers Riverview Condominiums, New
Orleans, LA
1039 Constance St Condominiums, New
Orleans, LA
Elmwood Homes Development, New Orleans
Patterson Homes, New Orleans, LA
Indiana Homes, New Orleans, LA
SINGLE FAMILY:
Stephani Residence, Gretna, LA
Lockett Residence, Marrero, LA
Romain Residence, New Orleans, LA
Engen Residence, New Orleans, LA
Lot 38, Abalon Court, New Orleans, LA
Lot 69, Abalon Court, New Orleans, LA
Lot 75, Abalon Court, New Orleans, LA
Meyer Residence, Lark St., New Orleans, LA
Residential Steel Framed Prototype for Olde
Orleans Design Group, New Orleans, LA
BACK ON TOP |
|
BULKHEADS & LEVEES |
|
Brazilier Island Bulkhead,
Lake Catherine, New Orleans, LA
Sheet Pile Wall
Replacement, West Hackberry, Department of
Energy Strategic Petroleum Reserves, Lake
Charles, LA
Sheet Pile Walls at Airline
Highway Jefferson Parish Bus Stops, Metairie, LA
New Orleans to Venice
Hurricane Protection Levee, Plaquemines Parish,
LA
and many more
BACK ON TOP |
|
WAREHOUSES |
 |
 |
 |
 |
 |
 |
 |
|
|
New Warehouse/Office
Addition
A-1 Appliance Warehouse, Industrial Blvd.,
Harvey, LA
Designed: 2000
Construction Completed: 2001
Description:
- Engineering design and development of
complete plans and specifications;
construction management
- Construction of a new warehouse/office
addition (37,000 sq. ft.) to an existing
warehouse/office (20,250 sq. ft.) on an
developed 2 acre site
- Prefabricated metal building framing,
steel stud secondary framing, metal and
concrete masonry exteriors, pitched metal
roof, roll-up doors, truck wells, truck
ramps, etc.
- Associated site work included a new remote
concrete paved parking lot, underground
drainage, etc.
Eastbank Electric Motors,
Kenner, LA
Designed: 1998
Construction completed: 1998
Description of Work:
- Engineering design
and development of complete plans and specs
- New construction on
an undeveloped 0.72 acre site
- Construction of new
office/warehouse (4,710 sq. ft.)
- Associated site work including electric
motor shop facilities, overhead
hoist/cranes, concrete paved parking lot,
underground drainage, etc.
- Pre-engineered metal
building frame, metal siding, interior metal
studs, gypsum board, suspended ceiling,
HVAC, lighting, office support, storage,
etc.
Eagle
Distributors, Kenner, LA
Designed: 2000
Construction completed: 2000
Description of Work:
-
Engineering design and development of complete
plans
- New
construction on an undeveloped 0.80 acre
site
-
Construction of new office/warehouse (11,478
sq. ft.) and associated site work including
distributor showroom areas, concrete paved
parking lot, underground drainage, etc.
-
Pre-engineered metal building frame, metal
siding, interior metal studs, gypsum board,
suspended ceiling, HVAC, lighting, office
support, storage, etc.
AAA Sports, Kenner, LA
Designed: 1998
Construction completed: 1998
Description of Work:
- Engineering design
and development of complete plans
- New construction on
an undeveloped 0.22 acre site
- Construction of new
office/warehouse (4,908 sq. ft.) and
associated site work including t-shirt
facilities, vertical storage areas, concrete
paved parking lot, underground drainage,
etc.
- Pre-engineered metal
building frame, metal siding, interior wood
and metal studs, gypsum board, suspended
ceiling, HVAC, lighting, special electrical
requirement for high voltage equipment,
office support, storage, etc.
Delta Waste
Office/Warehouse, Harvey, LA
Designed: 1999
Construction Completed: 1999
Description:
- Engineering design and development of
complete
plans and specifications
- Conversion of an existing 21,750 sq. ft.
open sided warehouse into office/warehouse
and vehicular maintenance facility for a
waste management company on a 2.6 acre site
- Office improvements and interior addition
(1,587 sq. ft.) and vehicle maintenance area
(20,163 sq. ft.)
- Foundation construction within an existing
prefabricated metal building structure
- New exterior metal siding, overhead
roll-up doors, roof vents, lighting, etc.
- Associated site work included a new
concrete paved parking lot, driveway, etc.
New Storage Facility
Belle Chasse Self-Storage, Belle Chasse, LA
Designed: 1999
Construction completed: 1999
Description of Work:
- Engineering design and development of
complete plans
- New construction on an undeveloped site
- Construction of single story storage
facility (17,500 sq. ft.) and associated
site work including various individual
storage units, office area, concrete paved
parking lot, etc.
- Pre-engineered metal building frame, metal
siding, interior metal studs, gypsum board,
suspended ceiling, HVAC, lighting, office
support, storage, etc.
New Warehouse (Shop)
Weavers Beauty Supply, Marrero, LA
Designed: 1999
Construction completed: 1999
Description of Work:
- Engineering design and development of
complete plans and specs
- New construction on an undeveloped site
- Construction of new office/warehouse
(6,000 sq. ft.) and associated site work
including wholesale customer facility,
concrete paved parking lot, underground
drainage, etc.
- Pre-engineered metal building frame, metal
siding, interior metal studs, gypsum board,
suspended ceiling, HVAC, lighting, office
support, storage, etc.
BACK ON TOP |
|
RELIGIOUS |
 |
|
Building Conversion /
Renovation
Beacon Light Missionary Baptist Church at St.
Anthony St., New Orleans, LA
Designed:
1997
Construction Complete: 1998
Description:
- Civil and
Structural Engineering design
- Development
of plans and specs for scope to convert an
existing
abandoned grocery store into a place of
worship
- Existing
1-1/2-story building (32,950 sq. ft.),
structural steel columns,
steel bar joists, masonry exterior walls,
interior concrete slab
- Renovations
included removal of some interior columns
and load
bearing framing and replacement with custom
made structural truss
and steel pipe columns, reconfiguring
structural framing on second
floor for new spaces, replacement of
damaged framing, addition of
second floor concrete deck, addition of
elevator shaft, installation of
interior cold formed metal framing,
reinforcement of cracked masonry walls
- Associated
site work included complete replacement of
parking lot
pavement, reconfiguring and replacement with
reinforced portland
cement concrete pavement, landscaping, etc.
Greater
King Solomon
West
Marrero Baptist Church
Change A
Generation
BACK ON TOP |
|
EDUCATIONAL |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
New
Classroom Building
St. Augustine High School, New Orleans, LA
Designed: 2003
Construction Completed: 2005
Description:
-
Design
and plans and specs for civil and structural
engineering
-
New
construction on an existing high school
campus
-
Three-story building, structural steel
framing, pile supported concrete slab,
non-composite concrete on metal deck upper
floor, hipped multi-level roof,
metal stud framing on 3rd level
-
Narrow
site, subsurface drainage, water and sewer
lines and appurtenances,
concrete and asphalt paving, etc.
New
Instrumental and Vocational Music Building
St. Stanislaus College, Bay St. Louis, MS
Design:
2002
Construction completion: 2006
Subconsultant to Award-Winning
E. Eean McNaughton
Architects
Description of work:
- New steel
framed building
- Civil and
Structural engineering design
- Development
of plans and specifications
- Construction
administration
DUICEF - New Classroom
Building
Dillard University, New Orleans, LA
Architect: David Brody Bond
Designed: 2002 Completed: 2003
Description:
Structural Engineering design
Development of plans and specs for scope
New construction on an existing university
campus
Two-story building (30,000 sq. ft.)
Structural steel framing, pile supported
concrete slab
non-composite concrete on metal deck upper floor
mono-slope
and canted semi-flat roof, built-up roofing over
metal deck
Challenging design effort included coping with
angular wall and roof lines
Stern Hall Renovations
Dillard University,
New Orleans, LA
Design: 2002
Construction completed: 2004
Subconsultant to B/H/M/W Architects
(Joint venture of Billes/Manning and
Hewitt/Washington)
Description of work:
Upgrade of HVAC, Electrical and Mechanical Works
and Interior Renovations
New Mechanical Penthouse over existing
mechanical/boiler room
Renovations to classrooms, restrooms and other
spaces
Conversion of existing attic space to new
classrooms, etc.
Retrofit new structural steel within existing
tightly enclosed
spaces for creation of new floors above
Challenging environment also required
reinforcement of existing
structurally eclectic framing system to
accommodate new work
Structural engineering design and development of
plans and specs
and construction administration
Districtwide Demolitions
and Site Improvements at Various Schools
Orleans Parish Public Schools, New Orleans, LA
Design: 1998 Construction completed: 1999
Description of work:
Management of demolition of various old school
structures
Pavement replacement, fencing, and miscellaneous
site work
Engineering design and development of plans and
specs
Construction administration
Districtwide Demolitions
and Site Improvements at Various Schools
Orleans Parish Public Schools, New Orleans, LA
Design: 1998 Construction
completed: 1999
Description of work:
Management of demolition of various old school
structures
Pavement replacement, fencing, and miscellaneous
site work
Engineering design and development of plans and
specs
Construction administration
Waterproofing, HVAC, ADA,
Labs, Etc. at Fortier High School
Orleans Parish Public Schools, New Orleans, LA
Design: 1997 Construction
completed: 1999
Subconsultant to Hewitt-Washington & Associates,
Inc.
Description of work:
Life safety improvements and miscellaneous
upgrades
New 4-stop elevator retrofit to the existing
school building
New HVAC system, restroom replacements, interior
slab replacement
New parking lot, underground drainage, etc.
Civil and structural engineering design and
development of plans and specs and construction
administration
Main
Building Replacement at Shaumburg Elementary
New Orleans Public
Schools
Design: 1998 Construction completed: 2002
Subconsultant to Hewitt/Washington Architects
Description of work:
New 70,000 sqaure foot single story elementary
school building
Pile-supported reinforced concrete slab
Pre-engineered metal building frame
Brick veneer with CMU backup
Civil and Structural engineering design and
development of plans and specs
and construction administration
Fischer Elementary School
Cafetorium, HVAC, and Asbestos - Orleans Parish
Public Schools, New Orleans, LA
Districtwide Demolitions
and Site Improvements at Various Schools -
Orleans Parish Public Schools, New Orleans, LA
Districtwide Renovation of
Floors at Various Schools - Orleans Parish
Public Schools, New Orleans, LA
Sewer, Drain and Locker
Room Improvements at Easton High School -
Orleans Parish Public Schools, New Orleans, LA
HVAC and Structural Repairs
at Warren Easton High School - Orleans Parish
Public Schools, New Orleans, LA
Sewer Main Replacement at
Southern University at New Orleans
New Dormitories at Southern
University at New Orleans
Information Center at
Southern University at Baton Rouge
BACK ON TOP |
|
TELECOMMUNICATIONS |
 |
 |
|
|
|
|
New Fiber Optics Routing
Williams Communications, City of New Orleans
Right-of-Way
Designed: 1998
Construction Completed: 1999
Description:
-
Engineering, permitting, and development of
complete plans and specs
- New construction of
42 miles underground fiber optics routing in
public r/w from downtown New Orleans to the
Mississippi State Line
-
Expansion of existing mass-media
communications network
New Fiber Optics Routing
Enron Communications, City of New Orleans
Right-of-Way
Designed: 1999
Construction Completed: 2000
Description:
- Engineering, permitting, and development
of complete plans and specs
- New construction of 14 miles underground
fiber optics routing in public
r/w from downtown New Orleans to the St.
Charles Parish Line
- Expansion of existing mass-media
communications network
New Fiber Optics Routing
American Metrocomm Corp. Inc., City of New
Orleans Right-of-Way
Designed: 1995
Construction Completed: 1996
Description:
- Engineering,
permitting, and development of complete
plans and specs
- New construction of
5 mile underground fiber optics ring in the
New Orleans CBD
- Creation of new
mass-media communications network
- Several subsequent
laterals to ensuing client-sites
Fiber Optics Routing
Vyvx, Inc., City of New Orleans Right-of-Way
Designed: 1997
Construction Completed: 1997
Description:
-
Engineering, permitting, and development of
complete plans and specifications
-
Construction of a new 1 mile underground fiber
optics routing in public right-of-way from
UPT to a new POP site
-
Expansion of existing mass-media
communications network
Fiber Optics Route
Permitting in New Orleans R/W - Williams
Communications
New Fiber Optics Routing,
City of New Orleans - Sprint Communications
BACK ON TOP |
|
INDUSTRIAL |
 |
|
|
New Effluent Plant Building
Gaylord Container Corporation, Bogalusa, LA
Designed: 2000
Construction completed: 2001
Description of Work:
- Engineering design and development of
complete plans and specs
- New construction on existing industrial
plant site
- Three-story industrial building (21,000
sq. ft.)
- Heavy structural steel framed open sided
building (galvanized), reinforced concrete
footings, pitched metal roof, stairways and
platform(s), masonry framed control room,
reinforced concrete elevated floors on metal
decking, heavy structural loading, and
associated miscellaneous site work including
provisions for process piping, cranes,
hoistways, underground drainage, etc.
BACK ON TOP |
|
INSPECTIONS & ASSESSMENTS |
|
Public and Institutional:
Hurricane Damage Structural Assessments, Dillard
University, New Orleans, LA
Hurricane Damage Civil/Structural Assessments at
Louis Armstrong New Orleans International
Airport, Kenner, LA
U.S. Army Corps of Engineers, Quality Assurance
Inspection Services in Support of Hurricanes
Katrina and Rita - New Orleans, LA
Structural Inspection at the Third St. Fire
Station, New Orleans, LA
Legal:
Arbitration for HANO vs. Residents Surrounding
St. Thomas Housing Development - 80 homes
affected by demo/construction at Florida
IMarket Street Commerce Center vs. Pacorini USA,
Inc - Inspection of 410 Josephine St.
(import/export metals goods storage facility)
Brenda Price, et. al. vs. HANO, et. al. - 33
homes affected by demolition and construction at
the St. Thomas Housing Development
Residential and Commercial:
Structural Inspection at 1909 Robert St., New
Orleans, LA
Structural Inspection at 2161 Rue Racine St.,
Marrero, LA
Structural Inspection at 2432 Jefferson St., New
Orleans, LA
Structural Inspection at 3844 Aspen Drive,
Marrero, LA
Structural Inspection at the Colesium Baptist
Church, New Orleans, LA
Structural Inspection at 2024 Armstrong Drive,
Marrero, LA
Structural Inspection at 5126 Annunciation St.,
New Orleans, LA
Structural Inspection at 501 Live Oak Dr.,
Metairie, LA
Structural Inspection at 1730 Lizardi St., New
Orleans, LA |
|